Skip to main content
Xiuben Solar Lighting
3 items · Click thumbnails to view
industrial led80/100W

GP LED Canopy Light (80W / 100W / 120W / 150W / 200W)

Model: GP

LED canopy light for petrol stations, canopies, low-bay ceilings. 80/100W, SMD 5050 48pcs LED, IP65, AC 100-277V.

Warranty
3-5 yr
MOQ
10 pcs
Lead time
15-25d
CE
Certified
RoHS
Certified
ISO 9001
Certified
Technical data

Specs, plain.

Every value verified on the production line. Need a parameter not listed? Ask us.

SizeL390*390*57MM
LEDSMD 5050 48pcs
IP RatingIP65
Input VoltageAC 100-277V
MaterialAluminum + PC
Warranty3 years
About this product

What it does.

The GP-80/100W LED canopy light is purpose-built for petrol station canopies, gas station ceilings, and low-bay commercial applications. SMD 5050 48pcs LED module delivers 130-150 lm/W with a wide 120° beam for even ceiling-level illumination. L390*390*57MM low-profile housing fits standard canopy recess mounts. 80/100W selectable, AC 100-277V input, IP65 rated for outdoor canopy use. Surface-mount or recessed-mount bracket included. Common applications: petrol station canopies, gas station ceilings, drive-through canopy lighting, parking garage ceilings, warehouse low-bay, and commercial canopy retrofits. Replaces 250-400W metal-halide canopy fixtures at 60-70% energy reduction. CE, RoHS, ISO 9001 certified.
Available variants

3 configurations.

One product family, multiple wattage and size configurations. Pick the right SKU for your project's pole height and lighting requirement.

SKUWattageSize
GP-80/100W80/100WL390*390*57MM
GP-120/150W120/150WL390*390*57MM
GP-200W200WL390*390*57MM
Common questions

Asked & answered.

The things buyers ask us most. Don't see yours? Send a question — we reply within 24 hours.

Generic for category
What is the warranty?
3 years on the full fixture, 5 years on the LED module, 10 years on the solar panel. We replace any defective unit at our cost.
What is the MOQ?
10 pieces for standard models. 50 pieces for fully custom builds. Sample orders of 1-3 pieces ship from stock at a small premium.
What is the lead time?
7-15 days for samples. 15-25 days for bulk orders under 500 pieces. 25-35 days for 500-2000 pieces. We confirm exact lead time with every quote.
How do I install it?
Every shipment includes a printed installation guide. Most fixtures mount to a standard 60mm pole tenon with 4 M8 bolts. No special tools needed.

Need a custom configuration?

Different wattage, color temperature, or pole height? We adjust to spec. Most custom orders ship in 25-30 days.

Talk to engineeringWhatsApp